Commit Graph

2 Commits

Author SHA1 Message Date
Power BI Dev
80f3e52596 Fix production assets in rebuild image
Exclude the Vite hot file from Docker builds and copy the SPOTA logo into the container so production deploys load compiled CSS and logo assets.
2026-05-03 19:38:35 +07:00
Power BI Dev
dab8ea396b Deploy Laravel rebuild via Coolify
Point Docker and Coolify compose to the Laravel rebuild app so mahasiswa, dosen, and admin flows are served from the new Laravel public entrypoint.
2026-05-03 18:50:29 +07:00